As announced the church is presently closed for painting and repairs. Later in the month the roof around the tower will be fixed since there are leaks around it. The main beam on the ceiling, a front ceiling cross beam, wooden stain glass window ledges, and the baptistery, or devotional room are being stripped, primed and painted. In that devotional room the area around the window and two areas on the walls have plaster deterioration. On the walls there are two actual half foot holes in the walls which were hidden behind furniture and statues.